Sanderling Way will be affected by lane closures from the Halbeath Road Roundabout to the Whimbrel Place junction from midnight on Sunday, January 12 until Monday, March 31.
The closures will be in force from 8pm to 5am each night.
The closure will allow for resurfacing works to take place safely as part of a wider £800,000 project of works at the roundabout.
Amey has listed the closures as follows:
January to March 2025
Overnight Lane Closures on all roads entering and exiting the roundabout and the roundabout itself
- Sunday 12th January to Friday 7th February (8pm – 6am each night).
- Monday 10th February to Thursday 13th March (8pm – 6am each night).
February 2025
Overnight Contraflow on the roundabout/Lane Closures
- Friday 7th February to Sunday 9th February (8pm – 6am each night).
- Sanderling Way will be closed in both directions to the roundabout at Whimbrel Place during this phase. Access to Fife Leisure Park at Whimbrel Place will still be available.
March 2025
Weekend Contraflow on the roundabout/Lane Closures
- Friday 14th March to Monday 17th March (8pm on Friday – 6am on Monday).
- Friday 28th March to Monday 31st March (8pm on Friday – 6am on Monday).
- Sanderling Way will be closed in both direction to the roundabout at Whimbrel Place during this phase. Access to Fife Leisure Park at Whimbrel Place will still be available.
Overnight Contraflow on the roundabout/Lane Closures
- Monday 17th March to Friday 28th March (8pm – 6am each night).
- Monday 31st March to Tuesday 8th April 2025 (8pm – 6am each night).
- Sanderling Way will be closed in both direction to the roundabout at Whimbrel Place during this phase. Access to Fife Leisure Park at Whimbrel Place will still be available.
An alternative route for traffic is available via Sanderling Way, Dunlin Drive, Linburn Road and Halbeath Road.
Access will be maintained for pedestrians and emergency services while this work takes place.
To contact Amey, who are carrying out these works, call 0800 083 0084.